The scope of labor would require the east driveway to generally be shut for the duration of construction which is expected to conclude early March 2021. Ambulance site visitors will continue on to obtain usage of the FSED by using the west driveway on East Bay Travel. Please be recommended https://pbase.com/rjmurphyconsca/r_j_murphy_construction_inc