The main park features a capacity of two hundred MW while Sandrini II incorporates a ability of one hundred MW. The whole cost of both tasks were not disclosed on the other hand, throughout building, about two hundred workers had been used. The projects are envisioned to check out a https://californiasolarcompany.travel.blog/2024/11/26/how-to-start-solar-energy-system-installation-with-a-california-solar-company/