The 25mm thick large metal tube is pushed With all the finish shut by a metal shoe. On reaching the expected driving resistance, a full size cage is reduced in for the tube and filled with high slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://cast-in-situ-piles-in-dha51748.anchor-blog.com/12869395/the-smart-trick-of-cast-in-situ-piles-that-no-one-is-discussing