1

Energy-Efficient 400 kW Chiller Installation Achieves £50,000 Annual Cost Reduction on Energy and 200 Metric Tonnes CO₂ Reduction

News Discuss 
Project Summary Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a major confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation boosts process efficiency while cutting overall power consumption and CO₂ discharge. https://bookmarks4seo.com/story20725844/high-efficiency-400-kw-chiller-installation-secures-fifty-thousand-pounds-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story